8592 is another step closer to being painted in MMA new paint scheme since it now has the battleship gray primer on it
Across the grave yard and through the trees, you can see the engineer of Providence & Worcester 3908 look ahead as he comes off the wye.
Back view of the sandblasted 8592
I have been sandblasted! Next step is to be primed and painted in the MMA colors after the accident
MMA 8592 is all repaired and is being prepared ( see the wood put on to protect certain areas) to be Sand Blasted and then painted in the new paint scheme.
As the Nacelles are being pushed back on the off load spur there size can be gauged by looking at the conductor on the 8 axle flat car
28 Nacelles are near there final destination as they go by the blades of the wind generation project
MMA job 110 bringing in 14 cars containing 28 Nacelles for the Mars Hill wind generation project
Unloading Area for Mars Hill wind generation project. MMA Job 110 is placing hubs for unloading
CSOR power idles in West Springfield Yard as a severe thunderstorm continues to push off to the east leaving a beautiful rainbow over Springfield. R.Pare... (more)
3902 has just finished dropping a tank car on a siding out of frame to the right and is about to tie back onto NR3.
3902 is pulling a set of cars working NR-3...the days work is almost done and once the cars are spotted, the 02 and 2215 will head back to the engine house.
Its Finished! At least the front of 8592 is all repaired after the run in with the tractor trailer in Hampden. The back is being worked on now.
MMA 203 switching the chip reload center while on its way to NMJ. MMA in its early stages brought six axle units to NMJ but stopped in later years
3908 and two other engines switch in behind the 16 to tie on and bring it back to the engine house.