All the tracks are full on the first day of 2005 with 15K on track 1 in the middle, 16N on track 2 to the right and a Detroit Edison coal train tied down in the siding.
133 heads west in the warm 8 degree weather
15J with ES40DC 7505 trailing in the heavy snow
205 heads west through a little lake effect snow with BNSF and UP power
Power to become 27J
BR15 shoves back home to rockport yard with the caboose leading.
BR15 heads west to do its work.