Westbound Three Rivers makes a station stop in Pittsburgh about 20 minutes down.
PRR GP-9 on display at Horseshoe Curve Park
The 12:54 Patchogue terminating train passes PD tower en route to the single layover track.
The 12:54 Patchogue terminating train crosses over into the single layover track east of the station and tower
Operator PD hoops up train orders to the Engineer of #517 for it to proceed east to Speonk.
A Rt 36 trolley sits on the Eastwick Loop. Note proximity to the R1 Regional Rail line
Broad St Local train heads out for another run downtown
Shoppe switcher 50 prepares to tow the Bombardier trainset headed by AEM-7 2003 dead back to Frazier yard.