Heading east out of Pittsburgh, 14G passes through a construction zone that will soon see the Conemaugh line relocated in this area. The tracks need to be shifted over to make way for the Route 28... (more)
The job of the rear end helpers on 36A has changed from a role of helping it up the 1% grade to helping keep it under control as it descends the 2.27% grade of "the slide"