Chinese track workers near the Erjing coal mine. They correct the track position with a straightening machine after the foreman has measured the track with a measuring rod and spirit level.
Only rarely do individual coal trains travel to another unloading point just south of Nanzhan for unloading, probably according to the quality of the coal. One of the cars is about to be tipped he... (more)
Barrier guard near Dongbolizhan station on the Sandaoling open cast pit railroad. The barrier is operated manually, the barrier on the other side of the three tracks moves simultanously via a wire... (more)