Waiting for the next call to duty RJC 2613 will lead the sand train and 1561 the local. SD70M 2613 was built for the NS
in March 2003 while GP15-1 was built for Conrail in November 1979 as their ... (more)
Over two and a half years after Union Pacific acquired Southern Pacific, there was still a fair amount of SP power on the Shasta Route. Led by one of the 25 SD70Ms SP acquired in 1994, a southboun... (more)