Shay No. 2's engineer preps the running gear with lubrication at Whittaker Station for the rest of the climb to Bald Knob.
Shay No. 2 eases past the renovated water tower on the Cass Scenic Railroad with a caboose to be placed on the end of the Bald Knob train.