CN 9555 heads North on the CN mainline as work equipment rests from the work on the new CN mainline. About 1/2 mile to the South new ballast is being layed.
WSOR 3807 switches car as Ackerville. To the left work continues on the new CN mainline. The old mainline will be used as a siding so CN can switch cars without being on the mainline.