After a brief stop in Brampton, the OBRY continues south to Streetsville with 4 cars in tow.
GSCX 7369 leads GEXR 432 through Brampton on a clear Friday morning.
The last GO train of the morning meets CN 393 at the diamond as it heads to Brampton Station to pick up passengers bound for Toronto.
Southbound OBRY crawls over the diamond with a single tanker in tow.
CP work crews step aside after doing work on the diamond to let the local short line pass down their ex-trackage.
CN 422 approaching the diamond with a trio of SD70M-2's.
GEXR 431 rolls westward with only minutes of shootable light left. A brand new bridge for a third main track has just been installed and is awaiting the new ROW to be built.
OBRY 1000 pounds the diamond with the CN Halton sub on its way south to interchange with CP at Streetsville.
CN 148 pounds the Orangeville and Brampton Railway diamond as the engineer gives a friendly wave. VIA 85 is sitting in the station to my back.