Amtrak's first E-60 (built 12-74) passes through the Aberdeen station area on a northbound run. Today, this scene is dominated by a highway overpass, built to eliminate the old East Bel Air Avenu... (more)
Engineer Harry A. Wilgis at the throttle of his DC-bound E-60 during a brief station stop. Note the cab signal over his left shoulder. Harry was the engineer of the first revenue run of Amtrak's... (more)
The E-60 that is now preserved at Strasburg is seen in its heyday crossing Bel Air Avenue at high speed on its way to Washington, DC. E-60 operations, the vintage autos, and the 4-lane grade cros... (more)