P&W 2009 leads train PR-3 under the decrepit Pawtucket-Central Falls station, built in 1916 for the New Haven Railroad. The train is running along Amtrak's Northeast Corridor.
Out of only a handful of operators, seeing a B23-7R “Super 7” rebuild anywhere in the United States is nearly impossible. The Connecticut Southern Railroad is one of those very few remaining o... (more)
P&W 2009 is on the tail end of train PR-3, which is dumping stone along the highway in Pawtucket, RI. The spur coming off the siding here leads to Key Containers.
P&W 2009 switches the yard at Valley Falls in Cumberland, RI after dumping ballast along the highway just down the line. P&W 2008 is seen in the background, along with the 1859-built church.
"Long Hood Forward through NRO" Providence & Worcester's "CHFP" heads west through New Rochelle Station on Metro North's New Haven Line during the early morning hours o... (more)
PW NR-4 heads south along the Thames to grab some cars from DOW.
PW 2215 leads CSO-4 into Springfield before shoving into the CSX yard.
" FPCH at Walk, Retro " ... (more)
Providence & Worcester PR-3 shoves a loaded boxcar around the corner into Atlantic Plywood in East Providence on a sunny Tuesday morning.
GE 7FDL16 Chug: Providence & Worcester train GRWO accelerates up to Morgan RD in Hubbardston, MA on their way back to Worcester after working the Pan Am interchange in Gardner. Looking like a stea... (more)
On a July 2014 afternoon in Danbury, the power for Providence & Worcester stone train CT-2 is parked on the former New Haven Railroad Maybrook Line. Note the old signal bridge still standing and c... (more)
CT-1 heads south on the Middletown Branch at Reeds Gap in Durham with cars from customers in the Middletown cluster.
Two properly painted Providence & Worcester GP38s trail on the back of a Polar Express trip heading back for Woonsocket crossing the Blackstone River.
" FPCH at Walk " ... (more)
" CT-2 at Bethel " P&W CT-2 passes the former station location in Bethel Con... (more)