The evening cardinal has made it's stop at Alderson and starts to accelerates out of town.
A CSX work train sits as the MOW crew works to load the equipment. The crew however would not get finished before a thunderstorm forces them to stop working for the night.
Q-303 with a few engines heads through Culloden.
The yard crew goes about there work switching cars in the yard. Since this photo was taking 1132 has been repainted into YN3.
The last run of the 2014 New River Train makes a rare trip across the Sewell bridge.
CSX 4527 doing its work at South Charleston yard.
A loaded coal drag grinds uphill under the old C&O signal at Eagle.
The last day of the New River Train passes under the large 3,030 feet steel arch New River bridge.
CSX 7493 in Conrail paint stopped just after the St Albans bridge. The crew waits for a signal to head up the coal river sub. Thanks to the crew for turning the marker light on.
CSX 5426 leads a unknown load through Scott at full track speed in the fading evening light.
CSX 422 heads uphill with train load of coal.
The 2008 new river train makes it's stop in St. Albans to drop off passengers.
A YN1 painted SD40-2 sits at Sproul waiting to get more DTC blocks to head on up the Big Coal Sub.