There are only two days before the start of the reconstruction of the Budapest Northern Railway Bridge. The work is supposed to be finish at 21 of September. The whole bridge will be replaced by a... (more)
A track reconstruction takes place on the Budapest-Újszász-Szolnok line. Track conditioning and winnowing between Sülysáp and Mende stations on one track. M62-120 is waits for starting it's wo... (more)
It's unusual to see M62 type engines with passenger trains on this line. But this time, the shortage of M41 type engines and an ongoing track reconstruction made this photo possible.
The Dunaújváros-Paks local freight arrives with the fresh cement loads for the new M6 motorway construction. The cars will be unloaded at the station of Paks and the cement will reach the operat... (more)