BNSF loaded coal train awaits a crew to depart the mines in the Powder River basin.
BNSF full coal rolls over the hill toward south with 5669 as a rear DPU on the middle track. UP empty coal is approaching on the right track headed by 6800 + 7070. Behind upper right is another UP... (more)
BNSF 5764 & 5885 head empty coal from the South while UP full coal descends toward Bill with 6648 & 8272 as the lead units. Another BNSF empty coal is awaiting for coal loading at Anterope coal mi... (more)
Empties returning to the mine
Another in the daily parade of Coal Trains from the Powder River Basin heading towards distant power plants.
A BNSF coal train waits to enter the mainline after being loaded at the South Black Thunder Mine in the Powder River Basin
UP full coal slowly approaches Bill from coal mine area on a sunny morning.
UP full coal descends Logan Hill. Behind upper right is a deadhead of BN fashon two SD70Ms ascending toward coal mine area. In the distance there is remaining smoke of blasting at Antelope coal mi... (more)
Evening full coal out of Powder River Basin with a SP fashon rear helper
Another load of Wyoming coal heads south out of the Powder River Basin in Wyoming.
A BN fashon SD70MAC 9732 collaborates with ES44AC 5772 to take full coal from North Antelope mine, making a big-S at Naaco Jct.
Two BN fashon SD70MACs head a powdering full coal toward south at busy Naaco Jct. on a sunny afternoon.
Westbound coal empty returning to the Powder River Basin to reload.
Southbound south of Bill, WY along highway 59 on the Orin Subdivision.