After a long wait the sun gods were good to us and gave way to some afternoon light just as 18N approached us with the 8104 in the lead. This was the first time the Lehigh Valley unit made it to t... (more)
The corn crop is at its infancy as the Monongahela heritage unit waits at the south end of the siding at Atwater for the conductor to throw the switch. The train will wait for 2 southbounds before... (more)