A very long eastbound SP manifest roars up the grade east of Bealville, with the head end exiting tunnel 5 and its trailers still passing in the foreground. This train was a good 10,000 feet long!... (more)
A helper set of a U36C and an F45 help an eastbound through the curves of Clear Creek Ravine.
559 East blasts out of the east portal of tunnel 5, a tunnel that was severly damaged by the earthquake here in the early 1950s.