After waiting almost 4 hours, BLE 908, 905, and 901 head through Oneida, brakes smoking as they hold back 38 loads of taconite while on their way to North Bessemer.
Southbound ore rolls under the cantilever signal at Oneida, Pa on a windy spring day in Western Pennsylvania. Soon this train will pass through Butler and Saxonburg as it rolls along to North ... (more)
Bessemer 910 and company lead a 73 car loaded ore train southbound past the aged cantilever at Oneida, just north of the city of Butler.
The calendar says it's a little past fall peak in the valley, but the trees say otherwise. Here, southbound iron ore loads roar through Oneida with a Bessemer cantilever signal and ancient pole li... (more)
95 empty hoppers scream north behind two rebuilt Boise tunnelmotors to be refilled with iron ore at the docks at Conneaut.