After dropping the 862 at the harbor and adding the 866 to the consist, the 0900 morning crew out of Greenville prepares to assemble a loaded ore train bound for the URR at North Bessemer.
After being skunked by the BLE and actually NS CSX and GE all day the Bessemer finally runs south in the late afternoon with a 5 unit light power move. The last 2 engines are a pair of CSX wide bo... (more)