It's a gloomy day looking out from the former control cab, now a parts unit on the OSR. The work is done and a pair of Montreal built MLW's back down the water track for the barn at Guelph Junctio... (more)
CP 234 came into Guelph Junction with 2 hot axles right at the tail end of the train. After waiting for CP 246 to clear and go down the Hamilton Subdivision, 234 pulled up and left the conductor b... (more)