The now retired GTW Engineer Bill Dunham preps his leader for the trip to Kirk. After building the train and pulling down to Michigan Ave Bill takes advantage of the time waiting on the Conductor ... (more)
Staged on the Fuel Dock, Power for L 507 and E 251 wait for their turn in the line-up out of Flat Rock. Engines are serviced and fueled here before turning back on the next assignment.
The Resurrected Tilted Wafer Logo. Brought back to life for the CN Business train the Logo now appears on the CN 3309. The engine has been dedicated to the latest version of the CN Business Paint ... (more)