The Z208 passenger train from Changsha to Tianjin has been towed by SS8 electric locomotive to Beijing because of the LKJ fault of DF11G diesel locomotive
The CRH6A EMU train is going into the Guangzhou South Railway Station when the CRH380B train is leaving the station.
The train K8382.
China standard EMU CR400AF, running in China's first high-speed railway, Beijing Tianjin intercity high-speed railway
Z264 passenger train (Guangzhou - Lhasa), because now is to Lhasa tourism off-season, so the train uses small grouping operation, only 11 carriages.
CRH380A&CRH380B.
The train 1154.
HXD1C type high power freight electric locomotive traction for new production, car transport vehicle (JSQ5), JSQ5 type double transport vehicle special vehicle, is the 27 Beijing vehicle factory i... (more)
G2922.
CRH380A.G2906,To Guilin North.
The train 33104.
HuaiRou North Railway Station, two commuter small ticket cars
CSR Zhuzhou locomotive factory produces SS8 electric locomotive