NS 143 south is powered by KCS 4117 as it heads south for Georgia on the NS Marion Branch. The train grinds away out of the Wabash Valley shortly after crossing the Wabash River.
NS L-89 heads south at MP-80 on the Marion Branch bound for Alexandria for the Frankfort District, then they will be west bound there for Frankfort, IN
NS 312 is running late as they pass the signal on top of the Marion Hill near MP-75 on the Marion Branch.
Northbound M44 leaves a white-out in it's wake as it cruises up the branch approaching the MP 30 signal.
NS 144 climbs the Marion Hill with a C39-8 leading the way at CP-75 on the Marion Branch.
On a sunny but frigid afternoon, 19K passes the PRR position light signal at MP 50.
A very late 312 knockes out some plowed snow on the NS Red Key south siding.
NS 312 had to be recrewed at Speicher siding before moving on to Marion.
NS L-89 and a 55A grain train are made into one train before heading south seen hear at CP-79 on the Marion Branch.
NS 174 climbs the Marion Hill at CP-75 on the Marion Branch
NS W24 heads south near MP-81 on the Marion Branch.
Running really late, NS 312 arrives Marion at around 9:00am with a pair of NS C40-9W's.
NS 55A is northbound at CP-79 on a cold frosty morning just after a light snow the night before.
NS L-89 heads south at CP-79 on the Marion Branch bound for Frankfort IN on the NS Frankfort District.
NS 906 south Geometry train has pulled around the wye at CP 79 to let a northbound NS 144 pass (in the background in this photo). The Geometry train will back around the wye, then proceed south on... (more)