It is 08.05 AM and the view goes from Alp Grüm on 2091 meter a.s.l. down to the station of Cavaglia on 1693 meter a.s.l. On track 1 is the snow clearing composition from Pontresina with dieselloc... (more)
Once the work in the Alp Grüm to Cavaglia area has been completed, the snow clearing train from Pontresina leaves Alp Grüm station from track 3 at 9.54 am for Ospizio Bernina to continue its wor... (more)
The Bernina line of the Rhaetian Railway is the highest crossing of the Alps by a railroad and is largely an open line. The highest station is Ospizio Bernina at 2253 meters above sea level. In he... (more)
The second train of the day southbound over the Bernina line of the Rhaetian Railway, train 4613 of line R19 from St. Moritz to Tirano with the "Allegra" railcar ABe 8/12 # 3508, arrives... (more)
The snow fighting crew of the Rhaetian Railway based in Pontresina is clearing the Bernina line between Alp Grüm and Stablini with "Zaugg" snow blower Xrot mt # 95404 pushed by "Schalke" diesello... (more)