Another day begins for the Galt Yard job. Most of the work will be for the benefit of aToyota Plant located at the top of the Waterloo Sub
An eastbound pounds across the Grand River bridge
The Galt yard job prepares to pull along string of empty multi's from Killean Siding for Toyota. The siding will be refilled within 24 hours
Waiting in the middle of Killean Siding for a westbound
8238 goes to Oshawa solo as trailing 8252 has failed.
Auto frames eastbound
Fresh paint.
After a lengthy absence, 3043 returns to the Galt yard in spectacular fresh paint.
Dead straight into the sun.