Posted by Dana M. on July 4, 2014 
One would think that perhaps Exporail would put in a diamond just for this very reason. It would be so much easier to move equipment into and out of the main hall.
Posted by Sid Vaught on July 4, 2014 
Made me look!
Posted by Michael Berry on July 5, 2014 
Moves in or out of the main hall occur every year or two, so I guess they are fine with doing this.
Posted by jdayrail on July 5, 2014 
Canada's failed attempt at grade separation.
Posted by Sport! on July 7, 2014 
More like a "run over" than a "fly over"
Posted by on July 9, 2014 
Judging by the location of the joints.. it's simply a piece of panel track to be installed/removed when needed. Probably takes 2 hours to set this up and 1 hour to take it down.
- Post a Comment -