Posted by Doug Wilson on December 5, 2013 
Is this a traveling slipform that extrudes the bridge span as it travels?
Posted by Georg TrĂ¼b on December 5, 2013 
The slipform is advanced about once a month, when concrete cured.
Posted by Felix Brun on December 6, 2013 
Hi Doug Yes it is. It slowly crawls through Zurich. As you can see there is no space for any installations on the Ground. Supply of concrete etc. is via the already built bridge. Felix
- Post a Comment -