Posted by on September 25, 2011 
Wow, looks like a very busy scene here. Thanks for documenting this history.
Posted by Jeff Sell on September 26, 2011 
The view of the classic Pennsy right-of-way out of Altoona is sure changing its looks. Sure are some big pieces of machinery squeezed in there to so the work. Thanks for sharing this update.
Posted by Chris Wilson on September 28, 2011 
Every railroad is different, at CN (my gang) we remove the old switch in panels and install the new one in panels (4 panels for a #12) (5 for a #20) and use 1 or 2 excavators! This usually takes about 5 hours with dumping ballast, and a lift. Thanks for sharing!
Posted by Brian K. Zimmerman on September 29, 2011 
I didn't even know that a switch came in one big piece like that! Reminds me of model railroading!
Posted by triplebuc69 on September 30, 2011 
Is this why passenger service is delayed?