Late Winter Snow Day On The Buffalo. Intermittent snowfall from the previous 20 hours coated the ground as CSX Y133 crossed the former New York Central Railroad Bridge over the Buffalo River in Buffalo, New York on the Compromise Branch on March 12, 2022 with CSXT 6515 (GP40-3) leading. In the background, the Concrete-Central Elevator sits idle. Operable from 1917-1966, this was the largest elevator ever built in the Buffalo, an area with a significant amount of grain and flour rail traffic.