KCS 4704 and BNSF 4540 were sent out of Galesburg to rescue all the crews along the Mendota Sub. After spending all morning doing so their next assignment was to pull a stuck train out of a drift after Hulcher cleared some of the snow away. This required getting a running start and plowing several 5 to 6ft drifts at least 500ft long just to get to the train.