Rolling through a sag, KLR train T08 negotiates an S-curve as it passes milepost 153 of the Havelock Sub. CP 3111, 8207, 8224 and 3114 provide the horsepower for this 33 car train, which includes a lumber load second in the consist and a Golden West Service boxcar 28 cars back. Boxcars are rare on this train; I'm not even sure where it might be going. 0946hrs.